Frequently asked questions
The questions we get most often from engineers, procurement leads and operators — grouped so you can jump to what’s on your mind. Don’t see your question? Email us at contact@bluequest.com.au.
Purus is a dynamic-membrane filtration platform that brings membrane-class fine filtration to the throughput, footprint and operating cost of industrial-scale filtration. The chemistry was invented at one of Queensland’s leading universities, published in Scientific Reports, and is now exclusively licensed to Blue Quest Group. The modular vessel platform around it is patent-pending.
Cartridge filters trade off throughput against removal — finer cartridges remove more but flow less and need frequent replacement. The Purus gel-membrane configuration provides fine filtration (about 10 nm size exclusion; up to 7-log MS2 bacteriophage removal in university laboratory tests) at industrial throughput, with backwash-restored operation rather than disposable cartridges. The coarser micron options trade some removal for higher throughput, but all share the same vessel architecture and maintenance philosophy.
It has been trialled at four named industrial sites — CS Energy at Kogan Creek dam, Evolve Group manufacturing, Terella Brewing, and Surf Lakes — with samples analysed by ALS Laboratories. See the Case studies page for the details.
Yes. Blue Quest Group Pty Ltd is an Australian company. Engineering, assembly and customer support all run from our facility in Windsor, Brisbane.
Throughput drives the size choice. The Purus 50.2 (small fixed unit, ~58 kL/day) suits buildings, HVAC, and craft brewing. The Purus 100.5 (skid, ~100 m³/day) suits general industrial, dams, and food production. The Purus 100.20 (20-ft containerised, ~3 ML / 30 days) suits mining, irrigation, and mobile deployments. See the Products page for full specs, or ask us to model your own scenario.
Lead time depends on the model, configuration, and queue at the time of order. Reach out via the contact form with your size, application and target timing and we’ll come back with a tailored response.
Capital cost depends on configuration, balance-of-plant requirements and site context. Send us your variables (water selling price, electricity, duty cycle) and we will model the annual return each filter element delivers, with a quote. Contact us.
Yes. Site trials are how we got the trial data on the Case studies page, and we encourage anyone considering Purus at scale to do the same. Trial scope is set per site — get in touch with your application details and we’ll put together a proposal.
Yes. Any Purus model can be supplied with a UV disinfection reactor fitted after the Purus outlet and wired into the Purus controller, which switches it on and off, watches its lamp-fail and low-UV-intensity alarms and holds the outlet if disinfection is not proven. Purus removes particles and most microorganisms; UV then inactivates bacteria and viruses that remain. The reactor is sized to your peak flow and required dose and quoted with your Purus package. See UV disinfection for how it works and the reactor for each model.
Yes, as pre-treatment. Purus removes particles, colloids and bacteria that foul RO membranes, and a UV stage after it inactivates bacteria and viruses without adding chlorine; where the incoming water is already chlorinated, a carbon or bisulphite stage stays ahead of the RO. Dissolved salts pass both stages and are removed by the RO. Every RO site starts with a pilot measuring silt density index, membrane pressure drop and cleaning interval on its own water. Blue Quest can also supply the RO stage itself. See RO pre-treatment.
Yes, for chiller and cooling-water circuits in Queensland. With our Purus Plug-and-Play Sidestream Service we install the unit on your circuit, operate and maintain it, and charge a monthly service fee after a short site assessment. It sits alongside our standard maintenance package. See the Chiller water treatment page for the packages and an indicative price range.
Backwash regeneration, not cartridge replacement. The gel membrane configuration is designed to be restored through backwash cycles and gel re-injection rather than disposed of and replaced; the gel itself is a low-cost consumable. The coarser micron elements have longer service intervals than equivalent cartridges and replacement is straightforward when needed. Ask us for an indicative comparison against your current cartridge OPEX.
Sequential. In multi-vessel installations, one vessel runs a backwash cycle at a time while the others continue producing — so total system uptime is maintained. Single-vessel installations include a duty-cycle allowance for backwash (defaults to 80% on the gel configuration; 100% on coarser options).
Each vessel runs on a dedicated pump set sized for the platform. Multi-vessel installations scale the pumping infrastructure proportionally. We provide detailed energy figures for your local electricity tariff and operating hours on request.
Blue Quest provides commissioning, training, and ongoing technical support from the Brisbane facility. Specific support arrangements (response times, spares strategy, remote monitoring) are set as part of the supply agreement — talk to us about what your site needs.
Our Case studies page covers the four trial sites with summary results. Full trial reports and site-specific performance data are available on request for serious enquiries — email contact@bluequest.com.au.
Trial samples are analysed by ALS Laboratories, an independent testing laboratory, rather than in-house.
The platform is engineered for export and we’re actively building international pathways. Reach out with your country, application and target volumes and we’ll come back with what’s practical.
Yes — engineering, assembly and customer trials all run from our Windsor, Brisbane site, and we welcome visits from prospective customers. Get in touch via contact and we’ll set up a time.
If we missed yours, drop us a line. We read every message and reply within two business days — engineering, sales and support all answer from Brisbane.